Plan Review Fee

BASE: $300, plus $25 for each sheet over 9

RESUBMISSION: 50% of base plan review fee, plus $12.50 for each sheet over 9

MODIFICATION: 25% of base plan review fee plus $6.25 for each sheet over 9

Inspection Fee

Based on 1.5% of total construction cost (from engineer’s probable opinion of probable construction cost), $300 minimum

System Capacity Fees

(Subject to change upon board determination)

Lehigh Acres

Residential and non-residential
Water: One ERC = 255 gallons per day at $2,695.68 per ERC
Wastewater: One ERC = 171 gallons per day at $2,839.17 per ERC

Golden Gate

Residential and non-residential
Water: One ERC = 350 GPD at $1,950 per ERC
Wastewater: One ERC = 350 GPD at $1,525 per ERC

Seven Springs

Residential
Water: One ERC = 300 GPD at $3,000 per ERC
Wastewater: One ERC = 129 gallons per day at $1,650 per ERC

Non-residential
Water: $10 per GPD
Wastewater: $12.79 per GPD

Aloha Garden

Residential
Water: One ERC = 270 GPD at $126.86 per ERC
Wastewater: One ERC = 270 GPD at $117.06 per ERC

Non-residential
Water: 47 cents per GPD
Wastewater: 43.4 cents per GPD