Project Title: Rio Vista Septic-to-Sewer Project
Project No. DUP15
Estimated Construction Budget: $30M
System: Dunnellon Utility
Description:
FGUA has undertaken a septic to sewer project in the Rio Vista community located in the City of Dunnellon. The project consists of connection of approximately 333 septic tanks from single family homes in the Rio Vista neighborhood in the Rainbow Springs basin management action plan (BMAP) primary focus area (PFA). This will result in approximately 3,300 lbs/yr nitrogen reduction in the Rainbow Springs. The project includes 154 grinder pump stations, a sanitary sewer gravity collection system, a sanitary sewer transmission line, roadway restoration and upgrades to an existing lift station. As of May 2025, the design is 90% complete. The design team is working on the final design deliverable. Final design is anticipated to be complete on or before September 2025. The project’s construction is anticipated to be 18 months with the overall completion anticipated in quarter 2 2027. The project’s estimated construction costs exceed the current Florida Department of Environmental Protection’s springs’ restoration grant. The project will be constructed in phases as additional grant funding becomes available. Property owners have commenced submission of the temporary access agreements required to allow FGUA’s contractor access to the respective properties during construction as needed for the construction of the grinder pump stations and abandonment of the existing septic tanks. Given that easements will be required for personal property and parcels will need to be secured for the lift stations, the grant agreement is being modified to reallocate funds from the miscellaneous task to a new land acquisition task.

