Project Name: Rainbow Springs WRF Decommissioning

Project Number: DUP 06

Construction Cost: $1,922,412.00

Utility System: Dunnellon

This project will decommission the Rainbow Springs Reclamation Facility, to include design and construction of upgrades and structures to convey wastewater to the Dunnellon Water Reclamation Facility. The Rainbow Springs and the Rainbow River are vital ecological and economic resources impacted by total nitrogen concentrations. Decommissioning the WRF will result in significant nitrogen removal from the Rainbow River.

Basins 2-5 have been drained and cleaned basins 2,4 and 5 have had concrete poured in bottoms and are waiting to have concrete poured to finish grade with channels. All other basins except #1 have been drained and cleaned. In basins 2-5, (15) sets of diffuser piping have been raised up to allow concrete to be poured in basins. (2) antiox mixer mounting brackets removed from basin #2. Project is 99% complete.