Project Name: 180th Avenue Package Plant Abatement

Project Number: DUP 14

Construction Cost:  $736,474.00

Utility System: Dunnellon

This project provides for the demolition of two existing package wastewater treatment plants located at the State Park and Dunnellon High School properties. The package plants will be replaced with wastewater lift stations that will pump wastewater to the existing FGUA force main located along the 180th corridor.

The piping at both the State Park Site and the Dunnellon High School site is complete.  The contactor has received all materials for both lift stations and anticipates completing the entire project by the end of March 2025.

 