Project Title: DUP 12 (Chatmire Septic-to-Sewer) Project

System: Dunnellon Utility

Construction Budget: $6.8M

Description:

FGUA has undertook a septic to sewer project in the Chatmire community located in the City of Dunnellon.  The project includes 210 residential lots with approximately 117 existing septic systems, 14,000 linear feet of gravity sewer collection lines, 1,640 linear feet of force main, a new lift station, 16,000 linear feet of roadway restoration and abandonment of existing septic systems and connect to the central sewer system.  This project is a primary project area within the Withlacoochee River Basin Management Action Plan and is funded by a FDEP springs grant.  Construction of the new central sewer system is approximately 90% complete with only two (2) manholes remaining to be excavated and set.  The sewer transmission lift station has been placed into continuous service since August.  Also, nearly all of the existing septic tanks have been abandoned and those property owners have been connected to the new central sewer for sewer collection and transmission.  Additionally, asphalt paving restoration and sealing of the existing limerock roads had been completed.  We have 12 properties along SW 106th Lane to complete septic tank abandonment and connection to central sewer.  The project is scheduled to be substantially complete May 2025.

 

 

Skip to content