Project Title: Amelia Island WTP Booster Pump Modification Project
System: Nassau Amelia Utility
Construction Budget: $3.8M
Description: The Booster Pump Modification Project will replace the existing booster pump station located on the Omni property in Amelia Island. The new pump station includes a new 1-million-gallon ground storage tank, four (4) split case pumps, one (1) vertical pump, a 500kW standby generator and associated electrical and controls equipment. The construction contractor, Sawcross, has completed the construction of the new ground storage tank, the new pump building and the new electrical building. All pumps, valves, VFDs, and communication systems have been tested. The 2-weeek operational availability test was completed in September. Upon successful completion of the operational availability test, the contractor demolished the existing booster pump station and set the new generator. Currently, generator’s above ground storage (AST) tank is being registered with FDEP. Once registered, the contractor and NAU operations staff will coordinate for a generator and automatic transfer switch. At that point, the project will be substantially completed. Remaining activities will include paving and installation of the new gate. The project is anticipated to be substantially complete in January 2025.


Figure 2: High Pressure Monitoring Panel
