Project Title: Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements
Project No: FRP10a and FRP10b
Construction Budget(s): $3.85M (FRP10a) and $2.0M (FRP10b) – Total $5.85M
System: Flagler
Description: The Plantation Bay WWTP treatment plant’s treatment process equipment is at the end of its useful life and requires replacement. The Phase II Improvements project will provide a new digester, aeration basin and clarifier as the primary biological treatment process. The project will provide Class I reliability and increase plant capacity. In May ‘23, Mack Industries, Incorporated was awarded the extended aeration basin and equipment construction and installation. The extended aeration basin inclusive of the concrete structure and mechanical equipment will be substantially complete by March ‘25. Mack’s construction contract does not include civil, site, mechanical piping outside the aeration basin and all electrical. The construction contract for the trade work was approved by the June FGUA Board meeting. The general contractor has mobilized to the site, conducted utility locates, and commenced construction of the new airheader piping. Both contractors are required to coordinate on the startup of the completed extended aeration facility.


Figure 2: Installing Handrail Along the Top of the Extended Aeration Basin


Extended Aeration Base Walls’ Tilt-up Panels


FRP10b Aeration Basin Diffusers