Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements FRP10a and FRP 10b – Updated 1.29.25

Project Title:  Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements

Project No:  FRP10a and FRP10b

Construction Budget(s):  $3.85M (FRP10a) and $2.0M (FRP10b) – Total $5.85M

System: Flagler

Description:  The Plantation Bay WWTP treatment plant’s treatment process equipment is at the end of its useful life and requires replacement.  The Phase II Improvements project will provide a new digester, aeration basin and clarifier as the primary biological treatment process.  The project will provide Class I reliability and increase plant capacity.  In May ‘23, Mack Industries, Incorporated was awarded the extended aeration basin and equipment construction and installation.  The extended aeration basin inclusive of the concrete structure and mechanical equipment will be substantially complete by March ‘25.  Mack’s construction contract does not include civil, site, mechanical piping outside the aeration basin and all electrical.  The construction contract for the trade work was approved by the June FGUA Board meeting.  The general contractor has mobilized to the site, conducted utility locates, and commenced construction of the new airheader piping.  Both contractors are required to coordinate on the startup of the completed extended aeration facility.

Figure 1: Extended Aeration Basin Walls and Top Slabs In-Place
Figure 1: Extended Aeration Basin Walls and Top Slabs In-Place

Figure 2: Installing Handrail Along the Top of the Extended Aeration Basin
Figure 2: Installing Handrail Along the Top of the Extended Aeration Basin

Tensiometer Required For Post-tensioning
Tensiometer Required For Post-tensioning

Extended Aeration Base Walls' Tilt-up Panels
Extended Aeration Base Walls’ Tilt-up Panels

FRP10b Air Header_result
FRP10b Air Header

FRP10b Aeration Basin Diffusers
FRP10b Aeration Basin Diffusers

 

Skip to content