Project Title: Plantation Bay Wastewater Treatment Plant (WWTP) Phase II Improvements

Project No: FRP10

System: Flagler

Description: The Plantation Bay WWTP treatment plant’s treatment process equipment is at the end of its useful life and requires replacement.  The Phase II Improvements project will provide a new digester, aeration basin and clarifier as the primary biological treatment process.  The project will provide Class I reliability and increase plant capacity.  In May ‘23, Mack Industries, Incorporated was awarded the extended aeration basin and equipment construction and installation.  Between January and March 2024, the structures base slab was placed, the wall panels were set and the precast walkway, top slabs were installed. The extended aeration basin inclusive of the concrete structure and mechanical equipment will be substantially complete by October ‘24.  Mack’s construction contract does not include civil, site, mechanical piping outside the aeration basin and all electrical.  This trade work will is currently under bid.  Bids will be received April 23, 2024.

Figure 1: Extended Aeration Basin Walls and Top Slabs In-Place
Figure 1: Extended Aeration Basin Walls and Top Slabs In-Place

Figure 2: Installing Handrail Along the Top of the Extended Aeration Basin
Figure 2: Installing Handrail Along the Top of the Extended Aeration Basin

Skip to content